For the attention of the passengers!
In connection with the current infrastructure works on the Georgian Railway (reinforced concrete tunnel construction ) from 08:40 on November 20, 2019 to 04:40 on November 21, during the “window” period, the – Makhindjauri- Chakvi railway stage will be closed. Accordingly, the train running schedule is changing:
On November 20-21, trains will run to the Black Sea on the following schedule:
– Train # 802/801 -Tbilisi – Batumi will arrive only at Kobuleti station at 12:35 on November 20 and depart from Kobuleti station at 18:26; The number of the train is # 810/809.
– Train # 804/803 – Tbilisi – Batumi will arrive only at Kobuleti station at 22:11 on November 20 and depart from the Kobuleti station at 08:21 on November 21; The train number is # 814/813.
-Train # 860/859 – Tbilisi – Batumi will arrive only at Kobuleti Station at 05:43 on November 20 and depart from the Kobuleti Station at 01:18 on November 21; The train number is # 858/857.
– Train # 614/613 – Ozurgeti – Batumi will arrive only at Chakvi Station at 09:40 on November 20 and depart from Chakvi Station to Ozurgeti at 18:41;
– Train # 684/683 – Kutaisi – Batumi, on November 20 will run from Kutaisi only to Chakvi Station. Arrival to Chakvi station- at 21:30. After opening the” window”, on November 21, the train will depart from Batumi at 8:35 according to the existing schedule.
Georgian Railway apologizes for discomfort and wishes you a happy trip!